Primavera P6

AACE Conference and Expo 2026

AACE Conference and Expo 2026 This year’s AACE Conference and Expo 2026 is on June 28-30. AACE (The Association for the Advancement of Cost Engineering) is celebrating 70 years of advancing the profession of cost engineering and project controls, as well as 50 years of its certification programs. This year, they’ve chosen a prestigious location

AACE Conference and Expo 2026 Read More »

Finish-to-Start Relationships in P6

Project success relies on schedule transparency. Finish-to-Start relationships (FS) drive schedule clarity. Let’s take a look. Quality schedules have a much higher probability of success. Of particular importance in schedule quality assessments are the relationships between activities. Activity relationships make schedules dynamic, so that the effects of schedule changes propagate throughout the schedule. This means

Finish-to-Start Relationships in P6 Read More »

The Network Diagram

This is the first in a series of Primavera P6 scheduling articles on the Network Diagram and Relationship Types. While most people recognize a P6 schedule by its Gantt Chart, the chronological roadmap of a project, the Network Diagram is the true engine behind the dates. It is the primary tool for visualizing project logic,

The Network Diagram Read More »

Using Total Float and Free Float in Primavera P6

A common question we get is: What’s the difference between Total Float and Free Float? Primavera P6 calculates both automatically every time you run a schedule. While most schedulers prioritize Total Float, understanding Free Float unlocks flexibility for field operations. Schedulers gravitate to total float in P6 because it appears in the “classic” schedule layout

Using Total Float and Free Float in Primavera P6 Read More »