With Primavera P6 EPPM Release 8.2 comes an interesting new tool, the Team Member Web application. This wonderfully simple interface opens the door for collecting status from folks who’ve never even seen the full Primavera P6 system.
Primavera P6
Deltek Releases Cobra 5.1 HotFix #11 (Build 5.01.404)
We were so excited by this news, that we forewent the morning coffee and doughnuts, booted up our Primavera P6 R8.2 test environment and promptly integrated a P6 R8.2 schedule into the belly of Deltek Cobra 5.1 (HotFix #11).
Oracle Primavera P6 Professional – Hint Help
Like me, you may be leery of built in help systems because your past experience with them has been less than positive.
Can You Run Primavera P6 on a Mac?
We get a few questions about whether tools like Primavera P6 Professional, Deltek Cobra, MPM and wInsight can run on Apple’s OSX, including the MacBook Pro. Ignoring Primavera P6’s EPPM web client for the moment
Primavera P6 8.2 Professional and Optional Client – Explained
The latest release of the Primavera P6 suite (Revision 8.2 December 2011) brings another change to the way the Professional client functions depending on whether you are installing it in an EPPM or P6 Professional environment. While this change is definitely for the better, it has generated a little confusion, so we’ll clarify things for you right now.
Primavera P6 Optional Client R8.1
Primavera P6 release 8.1 introduced a new iteration of an old favorite, the P6 Professional client, but in a form that has caused a little buzz and a little confusion among the user community. To clarify what exactly the P6 Optional client is, we thought it would be a good idea to both tell you what it is, and show you what it looks like.
SQLServerException: The TCP/IP connection to the host, port 1433 has failed.
SQLServerException: The TCP/IP connection to the host [name], port 1433 has failed. Error: “Connection refused: connect. Verify the connection properties, check that an instance of SQL Server is running on the host and accepting TCP/IP connections at the port, and that no firewall is blocking TCP/IP connections to the port.”
Oracle Primavera P6 Must Finish By Date
If you’ve ever opened a Primavera P6 schedule and wondered where all that negative float suddenly came from, then this article might help.
Primavera P6 History
I’m sometimes asked how long Primavera P6 has been on the market and what I know about its history. Fair question. You’d like to be sure you’re dealing with a
Deltek Cobra Integration with Primavera P6 R7
Earlier this month I published an article that incorrectly stated Cobra 5.1 only supported API integration with versions of Primavera P6 up to and including version 6.2.1. This information was out of date. I am very happy to retract that statement and inform you that Cobra 5.1 does indeed support Primavera P6 version 7 and has done so since May of 2011.