I and my Ten Six colleagues have worked with numerous clients who have successfully used Primavera P6 to run rudimentary earned value reporting systems; that is, until a big contract comes along.
P6 EPPM
Primavera P6 EPPM – Using Excel to Change a Global Activity Code into an EPS Activity Code
Many Oracle Primavera P6 EPPM deployments are developed ad-hoc, often without much in the way of ownership and putting it “right” can be nearly as big a technical challenge as it is a human one.
Primavera P6 EPPM R8.2 Enhancements – Video
Want to see Oracle’s Primavera P6 EPPM R8.2 new capabilities in action? Here’s a short 3 1/2 video overview taking a look at the latest enhancements introduced in Primavera P6 EPPM R8.2. It shows the performance improvements together with real time speed test and
Primavera P6 EPPM Service fails during node manager startup
Are you experiencing this issue? Primavera P6 EPPM Service fails during node manager startup Symptons: On Windows Server 2008 – When starting the P6 EPPM service using the start_Primavera.bat, the startup process fails and the command window collapses while attempting to load the Oracle WebLogic node manager portion of the startup script. Cause: Typically this can […]
Primavera P6 R8.2 Team Member Web Application
With Primavera P6 EPPM Release 8.2 comes an interesting new tool, the Team Member Web application. This wonderfully simple interface opens the door for collecting status from folks who’ve never even seen the full Primavera P6 system.
Deltek Releases Cobra 5.1 HotFix #11 (Build 5.01.404)
We were so excited by this news, that we forewent the morning coffee and doughnuts, booted up our Primavera P6 R8.2 test environment and promptly integrated a P6 R8.2 schedule into the belly of Deltek Cobra 5.1 (HotFix #11).
Calculating ROI for Enterprise Project Management Tools
When implementing enterprise project management tools such as Primavera P6, there are many savings that are often not taken into account when creating the business case. The list below is not meant to be exhaustive
Primavera P6 Optional Client R8.1
Primavera P6 release 8.1 introduced a new iteration of an old favorite, the P6 Professional client, but in a form that has caused a little buzz and a little confusion among the user community. To clarify what exactly the P6 Optional client is, we thought it would be a good idea to both tell you what it is, and show you what it looks like.
SQLServerException: The TCP/IP connection to the host, port 1433 has failed.
SQLServerException: The TCP/IP connection to the host [name], port 1433 has failed. Error: “Connection refused: connect. Verify the connection properties, check that an instance of SQL Server is running on the host and accepting TCP/IP connections at the port, and that no firewall is blocking TCP/IP connections to the port.”
Oracle Primavera P6 Must Finish By Date
If you’ve ever opened a Primavera P6 schedule and wondered where all that negative float suddenly came from, then this article might help.