Primavera P6 release 8.1 introduced a new iteration of an old favorite, the P6 Professional client, but in a form that has caused a little buzz and a little confusion among the user community. To clarify what exactly the P6 Optional client is, we thought it would be a good idea to both tell you what it is, and show you what it looks like.
SQLServerException: The TCP/IP connection to the host, port 1433 has failed.
SQLServerException: The TCP/IP connection to the host [name], port 1433 has failed. Error: “Connection refused: connect. Verify the connection properties, check that an instance of SQL Server is running on the host and accepting TCP/IP connections at the port, and that no firewall is blocking TCP/IP connections to the port.”
Oracle Primavera P6 Must Finish By Date
If you’ve ever opened a Primavera P6 schedule and wondered where all that negative float suddenly came from, then this article might help.
Primavera P6 History
I’m sometimes asked how long Primavera P6 has been on the market and what I know about its history. Fair question. You’d like to be sure you’re dealing with a
Primavera P6 Professional 8.2 – What’s new
Since we announced Oracle’s release of Primavera P6 8.2 late last year, we’ve had a little time to look at the Professional client software and some of the new features discussed in the release documentation.
Oracle Releases Primavera P6 R8.2
Tuesday, 27th December saw the release of Primavera P6 version 8.2 and this promises to be an interesting version. Release 8.2 offers lots of new features and many welcome enhancements to the Primavera
Oracle Primavera P6 Professional Filters – Get Filter Savvy
Oracle Primavera P6 Professional Filters How to Mix the ‘And’ and the ‘Or’ Options in One Filter Building a filter where all the conditions are either ‘And’ or ‘Or’ between each row is pretty straight forward. However, if you want to mix them up a little it’s not so obvious how you should do that […]
Enterprise System – Standalone Behavior
Probably the most obvious, and talked about change, after the release of Oracle Primavera P6 R8.0 was the shift of administration from the desktop client to the web application. This shift was further emphasized in P6 R8.1 when the Web Access application
Oracle Primavera P6 R8.1 – Reflecting on Reflections
In last week’s blog What Is A Reflection?, we discussed some of the key capabilities of Reflections in the Oracle Primavera P6 R8.1 Professional client. Since then we’ve received some great comments and ‘yes and’ ideas from folks who are using this capability out there in the field.
Primavera P6 Date Fields Explained
With dozens of date fields in both P6 (web client) and P6 Professional, it can be tricky figuring out what they all represent. If you’ve been wondering what the difference between a planned date and an anticipated date might be for example