Ten Six provides Primavera P6 consulting support that can cover every aspect of your implementation. Ten Six consultants have been implementing Primavera P6 EPPM since it was originally released back in the late 90’s. With two decades of experience in deploying Primavera P6 EPPM, Ten Six is uniquely qualified to partner with your organization to ensure a successful implementation.
Our proven structured approach allows us to bring to bear the experience of successful implementations to your own deployment. Our iterative approach to deployments has a heavy emphasis on user adoption. This ensures that the end result is more than just a successful software implementation; it’s a system that is truly embedded into your organization as a part of your overall business management process.
Primavera P6 Implementation Phases
Our Primavera P6 consultants guide you through all of the phases necessary for a successful Primavera P6 implementation. And our post-implementation assessments ensure that all goals and objectives are met and the expected business benefits are being delivered. The implementation phases include:
• Initial assessment
• Implementation planning
• Configuration
• Pilot
• Deployment
• Maintenance
Primavera P6 Technical Consultants
Our technical consultants work side by side with your IT staff and can handle all of the technical aspects of an enterprise Primavera P6 EPPM implementation including:
• Installation
• Integration
• Customization
• Upgrades
• Migrations
• Performance assessments
Our performance assessments have demonstrated that our implementations have saved our customers millions of dollars within the first six months of go-live. In each case, this was possible because we ensured that all Primavera P6 EPPM implementations were integrated with the existing Project Management Office (PMO), project management processes, governance structures and life-cycle models. If these processes are not already in place, Ten Six can help accelerate their development and deployment so that your overall implementation isn’t delayed.
The most successful Oracle Primavera P6 enterprise implementations are delivered by experienced consultants utilizing a proven structured approach. Take the risk out of your investment in Primavera P6 EPPM, and call Ten Six today.