Deltek Cobra Sample Customer Report for Download

Whenever I’m engaged to customize some Deltek Cobra earned value reports, the CPR Format 1 report is invariably a target for enhancement.

The request usually sounds something like this: “Take the CPR Format 1 report, strip out all those headers, put the SPI and CPI indices in there along with a column showing the EVT for work packages. Oh yeah, and if you can make the control account and work package rows different colors too, that would be awesome.”

To save us all a bit of time, I figured I’d develop a CPR Format 1 style custom report that has all the commonly requested features in it. You can download a backup of the report (.CRP) at the bottom of this page along with the Microsoft Excel template; should you wish to make further mods to it.

This “Cobra Guy” version of the CPR Format 1 can be installed on your Deltek Cobra system via the Restore feature.

 TCG_CPR_Format1_001

Deltek Cobra Report Downloads

Download and enjoy 🙂

TCG CPR Format 1.zip (Contains a backup .CRP file of the report with all configurations.  Download and restore this to your Cobra system)

TCG CPR Format 1.xlsx (Template only)