The following are the Deltek recommended system hardware requirements for installing Deltek Cobra 5.1.
Deltek Cobra n-tier Installation for 1 – 25 Concurrent Users
Tier
|
Hardware/Software Required
|
Determining Factors
|
Database Tier | Server Class Machine:
|
Database SizeDatabase Growth |
Application Tier | Server Class Machine:
|
Total Users
Power Users User Location |
Client Tier | Desktop Class Machine:
|
Applications Running on Client Machine |
Deltek Cobra n-tier Installation for 25 – 50 Concurrent Users
Tier
|
Hardware/Software Required
|
Determining Factors
|
Database Tier | Server Class Machine:
|
Database SizeDatabase Growth |
Application Tier | Server Class Machine:
|
Total Users
Power Users User Location |
Client Tier | Desktop Class Machine:
|
Applications Running on Client Machine |
Deltek Cobra n-tier Installation for 50+ Concurrent Users
Tier
|
Hardware/Software Required
|
|
Database Tier | Server Class Machine:
|
Database SizeDatabase Growth |
Application Tier | Two Load-Balanced Server Class Machines:
|
Total Users
Power Users User Location |
Client Tier | Desktop Class Machine:
|
Applications Running on Client Machine |
Click here to download this page
To read more Deltek Cobra articles click here