As more folks are considering the move to Microsoft’s SQL Server 2012, there is a need for easy step by step installation instructions. Well, we have a great download for you which is exactly that. Fortunately for us all, Khaled Elshaer from Canada emailed these step by step instructions into Ten Six this past week for us to share with you.
These instructions are complete with screen grabs and the principles and concepts apply not only to Microsoft SQL Server 2012, but to all Primavera P6 installations. The instructions for installing Primavera P6 with SQL Server 2012 are divided into 3 Sections.
- Installing SQL Server
- Configuring the SQL Server to allow Primavera connection
- Installing Primavera
The installation guide takes you through every step, check box and data entry request. It shows screen grabs of the entire process so you can easily see where you are in the process and what needs to be done next.
How To Install Primavera P6 On SQL Server 2012 Installation Guide
Click here to download this 20-page installation guide
We hope you find this useful and helps make your installation of Primavera P6 on SQL Server 2012 go smoothly and trouble free.