Learn P6 Report Development using Power BI

Ten Six Partner, Mustang Technologies is offering a 2-hour Online Power BI Training Session

Thursday November 12th starting at 10am US Central Time

Learn to develop a “Multi-Project Milestone and Contractor Report” for Primavera P6 using Microsoft’s Power BI (PBI). This report displays baseline activity dates, current activity dates, and variances. Users can view the activities from multiple projects using a variety of filters including Activity Status, Activity Type, and a couple Activity Codes.

This report extracts data directly from the P6 DB and loads the data into the PBI report. After the report is uploaded to the PBI Service, the report is automatically refreshed on a daily basis with P6 data without manual intervention.

Click Here to See Report Demo

Power BI

Session Details

  • Session: PBI-Session03 Create Multi-Project Milestone and Contractor Report. NEW SESSION
  • Session Training Level: Beginner to Intermediate (M Code and DAX Code will be covered)
  • Duration: Approximately 2 to 2.5 hours depending on questions.
  • Deliverables: Upon paid registration, students will receive a link to the November 12th 2-hour Training Webinar – and a link to a zip file with all the training material. Training material will include a link to a 3-hr recording, the PowerPoint Presentation as a PDF, the M Code and DAX Code for both a SQL Server P6 DB and an Oracle P6 DB, and the PBI reports for both a SQL Server P6 DB and an Oracle P6 DB.
  • Recording Provided: Yes

Only $99

Disclaimer:
  1. The PBI Report was developed using the P6 DB running on SQL Server. However, the M Code for an Oracle P6 DB will be provided as well.
  2. The Report references Activity Codes created in the Demo DB but may not be defined in your production environment.
  3. The M Code may require modifications to work in your environment – possible modifications will be discussed during the 2-hour Webinar.
  4. All training materials are provided “as is” without any warranty, guarantee, or support. The training material along with a link to a recording will be sent to you upon registration therefore no refunds will be provided.