Any enterprise Oracle Primavera P6 tool deployment requires more than just the software installed on people’s computers for it to be a success. An icon on the desktop, a login and a password might make it
Oracle Primavera P6 EPPM R8.1 – Screen Shots
After posting some screen grabs from Oracle Primavera P6 Professional R8.1 in a previous blog, we’ve had a lot of folks asking to see the Primavera P6 EPPM (web version). So below are a selection of high resolution screen shots from Oracle Primavera P6 EPPM Release 8.1..
The New Look of Oracle Primavera P6 Professional R8.1
For those Looky-Loos who’d like to get a peek at the new user interface for the P6 Professional R8.1 software, I’ve done a bunch of screen shots from various windows.
Deltek Cobra – Ampersand Destroys Backups
You could have a serious issue with your Deltek Cobra backup! If you have an Ampersand in your Cobra project name, you could have a problem with your Deltek Cobra backup. I recently discovered an interesting defect in the Backup tool while working in the latest version of Deltek Cobra 5.1, build 5.01.246, HotFix #03. […]
Deltek Cobra HotFix # 5 Just Released
Deltek have punched out another HotFix for Cobra 5.1. Installing this one will bring your Cobra installation up to Build 5.01.282.
Deltek Cobra – Cumulative vs. Current Period Actual Costs
An important decision to be made during the earned value system setup process is how best to load actual costs into Deltek Cobra. There are two basic options: a cumulative load and a current period load. The choice that will work best for your system depends on many things. You must know how Deltek Cobra […]
Backing Up Master Projects in Deltek Cobra 5
In this case I thought there was a problem with one of my Project backup CMP files when I attempted to restore it. The usual list of ancillary files was truncated to just the calendar.
Primavera P6 Professional Toolbar Map
With greater flexibility and enhanced customization, the interface for Oracle’s latest version of Primavera P6 Professional is a vast improvement over the earlier versions.
What is an Integrated Baseline Review (IBR)?
An Integrated Baseline Review (IBR) may for some seem like an overwhelming event, particularly if your organization has never conducted one before. This is a common situation for commercial organizations that are venturing into the government contracting world or are now encountering
Deltek Cobra 4 to 5 Report Map
For those of you in the process of upgrading from Deltek Cobra 4 to the new Cobra 5, here’s a table that shows the old report names and their Cobra 5 equivalent reports.