We are excited to announce the availability of our new Primavera P6 Professional online, self-paced, video training class. Shot in high definition and recorded using studio equipment, this class
Oracle Primavera Gateway
While Oracle released Primavera Gateway over a week or so ago together with Primavera P6 R8.3, today they formally announced it at COLLABORATE 13 which is being held in Denver, CO.
DCMA EVMS Glossary of Acronyms
Free download – DCMA EVMS Glossary. The DCMA recently went public with their Program Analysis Pamphlet (PAP), a document that we’re recommending to anyone involved with EVM including analysis and schedulers. It’s well written and very informative and a terrific resource for the EVM practitioner. See our blog Program Analysis Pamphlet – Public Release for […]
Oracle Primavera P6 Visualizer
With the recent release of P6 Professional R8.3, which you can read about here in a previous blog, Oracle Primavera has introduced a new tool called the P6 Visualizer. This tool
Deltek Cobra 5.1 HotFix 02 Released
Just to let you know folks, there’s a new HotFix available for Cobra 5.1 on the Deltek support web site. So fire up those DSMs and download the latest and greatest. This is the second HotFix since the regulatory release (hence Deltek Cobra 5.1 HotFix 02) and this build (5.01.1276) resolves 35 software issues. Not […]
Oracle Primavera P6 R8.3 Is Released
The exciting news this week is that the long-awaited Primavera P6 R8.3 update is now available for download on Oracle’s e-delivery website. This release includes
Deltek Cobra 5.1 Apportionment Mapping Import
A recent HotFix release offers a new option in the Integration Wizard: Apportionment Mapping. Keeping in mind that the HotFix program is in place primarily to provide customers regular fixes to priority issues
Deltek Cobra 5 Can’t Connect To The Database
This Deltek Cobra error can appear occasionally and came up recently, so I’d thought I would let everyone know why it occurs and what you can do to resolve it.
How To Install Primavera P6 On SQL Server 2012
As more folks are considering the move to Microsoft’s SQL Server 2012, there is a need for easy step by step installation instructions. Well, we have a great download for you which is exactly
Oracle’s Primavera P6 Analytics 3.1 Is Released
Oracle just released its latest version of Primavera P6 Analytics (version 3.1). This feature packed release introduces new capabilities, additional sample reports and dashboards and takes advantage of