Deltek Cobra 4 to 5 Report Map
For those of you in the process of upgrading from Deltek Cobra 4 to the new Cobra 5, here’s a table that shows the old report names and their Cobra 5 equivalent reports.
Deltek Cobra 4 to 5 Report Map Read More »
For those of you in the process of upgrading from Deltek Cobra 4 to the new Cobra 5, here’s a table that shows the old report names and their Cobra 5 equivalent reports.
Deltek Cobra 4 to 5 Report Map Read More »
For those who haven’t heard, Deltek released Cobra HotFix #04, build 5.01.264 on 7/29/2011.
Deltek Cobra HotFix #04 – Released Friday 29th July Read More »
I’m pleased to see this HotFix because some of the items it addresses have been biting me in the rear end for a while; to such an extent in one case, that one of my customers has been delaying upgrading from 5.0 to 5.1 until these items were addressed.
Deltek Releases Cobra 5.1 Hotfix #03 Read More »
This one had me on the ropes for a while. I couldn’t find where one is supposed to go to add a new ‘Result’ in the Deltek Cobra 5 system. In Deltek Cobra 4.7, one simply dialed into the System | Configure | Fields… menu structure and you could add results in the Configuration dialog.
Adding a Result to the Cobra 5 Database Read More »
For an Earned Value Management (EVM) practitioner, the term ‘budget’ and the term ‘forecast’ have two very distinct meanings. However the terms are not always used in correct context, particularly in organizations that are new to earned value.
Budget Versus Forecast Read More »
As much as I always try to be as accurate as possible in the information I share about Deltek’s applications, I goof things up once in a while.
Deltek Cobra 5.1 Re-examined Read More »
If you’re ever faced with doing a single point adjustment in Deltek Cobra 5, then check this document out first.
Performing a Replan in Deltek Cobra Read More »
I was rather mystified to find that when I ran a CPR Format 1, the thing was wall-to-wall zeros; with the exception of my Undistributed Budget row.
Deltek Cobra – Zeros in CPR Format 1 Read More »
In an integrated Earned Value Management System (EVMS), the contract Work Breakdown Structure (WBS) is the hub upon which all things depend. Some organizations new to Earned Value Management
WBS In An Integrated Earned Value Management System Read More »
Are you experiencing this Deltek Cobra Integration Warning? [Warning]Resource code Engineer on activity 1.1.3.1 could not be found in structure file Explanation: This warning appears in the Deltek Cobra integration log when a resource cannot be located in the Resources file for the target project. In this case the term structure file is referring to
[Warning]Resource code Engineer on activity 1.1.3.1 could not be found in structure file Read More »