Finding Your Favorite Reports in Deltek Cobra 5
For those of you in the process of upgrading from Deltek Cobra 4 to the new Cobra 5, here’s a table that shows the old report names and their Cobra 5 equivalent reports.
This list only shows those reports that I have been able to determine have a close or exact equivalent in Cobra 5. If it’s missing from the list, that means that I’ve not yet found a close alternative report. I’ve looked through all reports in both systems, but there are some I just can’t seem to map. The unmapped reports are mostly system and support reports as it turns out, so you’re not going to be short on your CDRL deliveries this period.
In a few cases, there are no direct equivalents, such as the FoxPro MSSTATUS report (an old favorite of mine), the CUSTOM report (which makes sense, since there’s no FoxPro reports to customize any more), and a few others that I just can’t seem to find close alternatives for in the new system. If I do, or if someone can drop me a line about some of these MIA’s, I’ll be happy to update the table accordingly.
Anyway, I hope this helps you find what you need in the new version.
Deltek Cobra 4 to 5 Report Mapper
|
|
Not Available | 1921-1 |
533M | 533M |
533Q | 533Q |
ACCESS | Access |
Not Available | Apportionment Mapping |
BASELINE | Log |
BB_LOG | Log |
BUD-ACT | Budget-Actual |
CALCLIST | Resource Calculations |
CALENDAR | Calendar |
CAP | CAP – limited to 1 year view – use Time-phased report as alternative to get full project duration. |
CAPFTE | CAP or Time-phased report with Results criteria selected in Reporting Wizard |
CAPTREND | Trend |
CAP_RSLT | CAP or Time-phased report with Results criteria selected in Reporting Wizard |
CBB_LOG | Log |
CFSR | CFSR |
CLASS | Classes |
CODELIST | Codes |
COSTSETS | Cost Sets and Classes |
CPR | CPR Format 1 |
CPR2 | CPR Format 2 |
CPR3 Reporting… | CPR Format 3 |
CPR4 | CPR Format 4 |
CPR5 | CPR Format 5 |
CSSR | CSSR |
CURVE | Curve |
CUSTOM | No equivalent – FoxPro template so not required in Cobra 5 |
EVCURVE | Curve |
EVM | Earned Value |
EVWORK | Project Data |
EVWORK2 | Project Data |
HIST | Histogram |
JIG_6 | Project PLng Stats |
Log | Log |
MR_LOG | Log |
RAM | Pivot |
RATELIST | Rates |
REPLIST | Report List |
ROI | ROI |
SPI-CPI | SPI-CPI |
STATUS | Use Code or Export Code |
STRUCODE | Use Code or Export Code |
STRULIST | Use Code or Export Code |
STRUWIDE | Use Code or Export Code |
SUMBYCST | Use Project Cost Set |
SUMCSTH | Project Cost Set Rslt |
SV-CV | SV-CV |
SVVSCV | SC vs CV |
TCPI | TCPI |
UB_LOG | Log |
WAD | WAD |
You can download this table here Deltek Cobra 4 to 5 Report Map